Working packages

Working packages

PB Name/ Person responsible Tasks Outputs
1 Management and communication /prof. Dvořák 1.1.Developing a quality plan 1.2. Determination of the communication platform and repository of project outputs 1.3. Financial management of the project 1.4. Conduct regular meetings and follow up on tasks Quality plan Risk management plan Progress report Evaluation report Financial administration Minutes from meetings
2 Area monitoring and data collection /Assoc. Prof. Ižvoltová 2.1.Design and assessment of data collection methodology – selection criteria are accuracy, reliability, availability of assets and atmospheric effects 2.2.Collection of attribute data – according to status and required resilience criteria Data collection methodology Raw data set
3 Data analysis, creation of 3D model / Assoc. Prof.  Ižvoltová 3.1. Data analysis 3.2. Creating a data driven model 3.3 Integrating a data driven model into a digital twin 3.4. Data storage Digital model Technical report Processed data set
4 Creation of database (innovative integrated system) / Assoc. Prof. Kvet 4.1.Designing a data model for storing and processing large data sets 4.2. Selection of appropriate technologies, database implementation in cloud environment 4.3. development of the information system in a web-based environment with regard to user interfaces and integration of systems with existing solutions 4.4. IT support for other tasks of the project Data model Database in the cloud environment Information system in a web environment
5 Analysis of the resistance of assets on the pilot section / Assoc. Prof. Odrobiňák 5.1.Status of the bridge infrastructure and its implementation in the digital model 5.2. Creating of numerical computational models 5.3. Resistance in the form of load 5.4. Determination of overall resistance Numerical FEM model Information model Asset resistance Vibration propagation model from traffic
6 Design of appropriate measures to increase the resilience of buildings / Assoc. Prof. Papán 6.1. Proposal for regime and organisastional measures 6.2. Desing of technological measures 6.3. Proposal for technical measures 6.4. Design of life cycle management of assets in the Slovak Republic Technical report Methodology for life cycle management of assets
7 Dissemination, implementation / Assoc. Prof. Figuli 7.1. Creation of the project website and its updating 7.2. Creation of promotional materials and videos of achievements status 7.3. Dissemination of results via social networks (Facebook, Researchgate, LinkedIn, etc.) 7.4. Presentation of results at scientific conferences and popularization activities 7.5. Publication of results in scientific journals 7.6. Estabilishing a plan for the exploitation of results Project website Social media posts Scientific publications in journals and conference proceedings Plan for the exploitation of project results